Cultana Pumped Hydro

Project Details

Project Name Cultana Pumped Hydro
Status Proposed
COD (Planned / Actual)
Capacity (MW) 225
Energy Storage (GWh) 1.8
Duration (Hours) 8
Head (m) 300
Upper Reservoir Name TBD
Lower Reservoir Name Gulf of Spencer (seawater)
Closed-Loop or Open-Loop Closed-Loop (Seawater)
Location (State, Region) SA – Cultana
Coordinates ~32.6° S, 137.8° E
Developer / Owner Hydrostor
Transmission Link SA grid
Estimated Cost (AUD)
Funding / Partners ARENA
Environmental Status Pre-approval
Construction Timeline
Job Creation (FTEs)
Integration Role Demonstration of seawater PHES
Website https://www.hydrostor.ca
References Hydrostor; ARENA

Location Map